Handover (taking over the property)

The stage when the property is actually handed over: inspection, defects, payments and formal acceptance.

Handover is when the property passes to the buyer. In practice it is several linked steps: a notice that the unit is ready, a check of the contract terms, an inspection of the unit, a record of defects, payments and receiving the keys. Keep handover apart from registering ownership and issuing the title deed, because these stages produce different documents. For an off-plan property, study the procedure and the order of steps in advance, using the contract and the applicable procedures.

When you receive the handover invitation, check the sender, the apartment number and the proposed dates. Ask for the list of documents and payments required under the contract. Compare the statement with your own record of transfers to spot missing payments or duplicate charges. If an amount is unclear, ask for its basis and a breakdown. A written answer helps resolve the question before the meeting, when there is usually less time to study documents.

Take the floor plan, the finishing specification and the agreed equipment list to the inspection. Check that the unit matches the property you chose, and record defects in the parts you can inspect. If needed, invite a technical specialist. Label photos by room and link them to specific items on the list; a general album with no descriptions is harder to use at a repeat inspection and when discussing completed work.

Before signing the handover certificate, read which facts and obligations it records. Ask how defects will be fixed, how contractors will get access and how the result will be checked. Dubai’s jointly owned property law separately regulates liability for structural defects and for faults in engineering installations. Applying these rules to a specific case requires studying the documents; discuss a dispute about quality with a qualified specialist, and keep the correspondence and the inspection results.

A common mistake is to reduce handover to receiving a key. Record the number of keys and access cards, the equipment handed over, meter readings, the management contacts and how to report faults. Ask separately about utility connections and when charges start. If a representative takes over the property for you, check their authority in advance and agree on the limits of their decisions: which documents they sign and which questions they pass to the owner before signing.

The next step is to prepare your own handover checklist based on the contract, split into the unit, documents, money and access. After the meeting, keep the signed certificate, the defect list and the payment confirmations. Schedule a repeat check of the items that need fixing, and track the issue of the ownership document separately. This order helps you move from completing the deal to managing the apartment, with a clear record of its condition and of each party’s obligations.

Also called

property handover, handover inspection, snagging, key handover, handover Dubai, apartment handover

Related terms

In the guide

Buying off-plan in Dubai: from project check to handover

Sources

Checked on 10 November 2026